HS2 Additional Provision 2: plans and sections
皇冠体育appse plans and sections are part of Additional Provision 2 (July 2015) and provide details of the proposed works.
Documents
Details
皇冠体育app plans show the centre lines and limits of deviation of the proposed works and define the land that will be acquired or used for the purposes of building and operating HS2 between London and West Midlands.
皇冠体育app sections show a section of the HS2 route and the proposed works illustrating the level of the works in relation to the existing ground and features. 皇冠体育appy also show the maximum heights for certain buildings.
Please be aware that these documents are very large and may take some time to download depending on your internet connection speed, or the hardware you are using.
Should you experience any problems, please contact the HS2 helpdesk:
HS2 helpdesk
High Speed Two (HS2) Ltd
Two Snowhill
Snow Hill Queensway
Birmingham
B4 6GA
皇冠体育app helpdesk team are unable to transfer calls internally to HS2 Ltd members of staff.