Boiler Upgrade Scheme Regulations: approved standards, grant categories and grant levels
Lists of standards, grant categories and grant levels that have been approved for the scheme.
Applies to England and Wales
Documents
Details
»Ê¹ÚÌåÓýappse documents list:
- the standards the Secretary of State has approved for the purposes of Regulation 4 of ‘�
- the grant categories and grant levels the Secretary of State has approved for the purposes of Regulation 13 of ‘�
Updates to this page
-
Updated to list MCS 007 Product Certification Scheme Requirements: Heat Pumps: version 7, published 24 April 2025; Home Insulation and Energy Systems Contractors Scheme (HIES) Code of Practice Version Q, published 5 March 2025, operational from 1 May 2025.
-
Updated to list Issue 2 of Microgeneration Installation Standard: MIS 3005-D »Ê¹ÚÌåÓýapp Heat Pump Standard (Design).
-
Added list of grant categories and grant levels approved for the Boiler Upgrade Scheme.
-
List of standards updated with the approved codes of practice as required by Regulation 4(1)(j).
-
First published.