Hornsea Two Offshore Wind Farm � Variation 1
Details of Hornsea Two Offshore Wind Farm � Variation 1.
Documents
Details
In September 2016, the Secretary of State granted a Development Consent Order (DCO) for the Hornsea Project Two offshore wind farm. »Ê¹ÚÌåÓýapp pre-application, examination and DCO documents can be found on the Planning Inspectorate website.
»Ê¹ÚÌåÓýapp DCO authorises DONG Energy to construct and operate up to 2 offshore generating stations with a maximum capacity of 1800MW. »Ê¹ÚÌåÓýapp project is located adjacent to Hornsea Project One offshore wind farm in the North Sea and is located approximately 90km off the East Yorkshire coast. »Ê¹ÚÌåÓýapp development could comprise of up to:
- 300 wind turbines
- 2 offshore accommodation platforms
- 6 offshore HVAC collector substations
- 2 offshore HVDC converter substations
- 2 offshore HVAC reactive compensation stations
- subsea inter-array electrical circuits
- subsea cable connections to the shore
On 18 July 2017, the Marine Management Organisation (MMO) received a request from DONG Energy to vary the Deemed Marine Licences contained within Schedules 9 and 11 of the Hornsea Two Offshore Wind Farm Order 2016.
»Ê¹ÚÌåÓýapp MMOs decision was to vary the DML as detailed in the Notice of Variation, effective from 26 September 2017.