Map

Plans and Sections for HS2 Phase 2b (Crewe � Manchester)

»Ê¹ÚÌåÓýapp drawings provide details of the proposed works to support the High Speed Rail (Crewe â€� Manchester) Bill.

Documents

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

»Ê¹ÚÌåÓýapp plans and sections are presented in volumes. At the start of each volume is a key plan which can be used to find specific locations on the plans.

»Ê¹ÚÌåÓýapp plans provide details of the following:

  • centre lines and limits of deviation for the proposed works
  • land that will be acquired or used for the purposes of building and operating High Speed Two (HS2)

A description of the land, together with details of ownership, occupiers and those who have a legal interest is included in the Book of Reference. »Ê¹ÚÌåÓýapp sections show specific parts of the HS2 Phase 2b (Crewe â€� Manchester) route and the proposed works. »Ê¹ÚÌåÓýapp level of works are illustrated in relation to the existing ground and features. »Ê¹ÚÌåÓýappy also show the maximum heights for certain buildings.

Volume 2 includes a map showing the proposed tramway required for Parliamentary Standing Order 29.

Updates to this page

Published 24 January 2022

Sign up for emails or print this page