Renewables obligation level calculations: 2019 to 2020
皇冠体育app level of the 2019 to 2020 renewables obligation (RO) and the underpinning calculation methodology.
Documents
Details
皇冠体育app Renewables Obligation Order 2015 requires the Secretary of State to announce the level of the obligation 6 months preceding an obligation period. This note sets out the size of the obligation for the 2019 to 2020 period.