Requesting an extension of time by e-mail
Directions under rule 109 of the Patents Rules 2007 to extend a specified period may be made using electronic communications.
Documents
Details
Use this guide for directions under rule 109 of the Patents Rules 2007 to extend a specified period may be made using electronic communications.
皇冠体育app reference in these directions to the ipo.gov.uk domain name was introduced by a direction effective from 2 April 2007.
皇冠体育appse directions were amended by a direction effective from 17 December 2007.