Smart Metering Implementation Programme: Smart Metering Equipment Technical Specifications
»Ê¹ÚÌåÓýapp requirement to install metering equipment in Great Britain which complies with these Smart Metering Equipment Technical Specifications (â€�
Documents
Details
»Ê¹ÚÌåÓýapp requirement to install metering equipment in Great Britain which complies with these Smart Metering Equipment Technical Specifications (SMETS) arises from standard licence conditions 39 and 40 in electricity supply licences and standard conditions 33 and 34 in gas supply licences.
»Ê¹ÚÌåÓýappse SMETS were amended and restated by the Secretary of State on 31 March 2014; the amended version replaces the version of that document designated on 18 December 2012. »Ê¹ÚÌåÓýapp amendments clarify a small number of requirements following consultation. »Ê¹ÚÌåÓýapp government response to the regulatory arrangements for enrolment and adoption of Foundation Meters consultation explains these amendments. »Ê¹ÚÌåÓýapp original version of these specifications is also available on request. Any enquiries regarding this publication should be sent to us at [email protected]