SR2015 No 38: removing 100 metres of exposed gravel from bars and shoals
SR2015 No 38: removing 100 metres of exposed gravel from bars and shoals over a 1 km length of main river.
Applies to England
Documents
Details
皇冠体育appse rules allow you to remove up to 100 metres of exposed gravel from bars and shoals over a 1 km length of watercourse on a main river.
皇冠体育appse rules do not allow you to:
- dredge within 8 metres of a flood defence or drainage work
- carry out these activities during the fish breeding season